What is my occupant load?

27 Monday Apr 2020

Posted by Michael Gaertner, Sr. in Uncategorized

≈ Leave a comment

Governor Abbott’s Executive Order GA-18

As Texas begins to re-open from the Covid 19 restrictions, Governor Abbott has allowed certain establishments to open their doors, but only at 25% of their occupancy.  This will leave many businesses wondering “what is 25% of my occupancy?”

Occupant loads are established by the building code.  Galveston, and most of the cities around here use the 2012 edition of International Building Code.

Table 1004.1.2 gives the occupant load based on the area of the space in square feet (scroll down to the table). For example, a business occupancy is calculated at 100 s.f. per person.  If your office is 2,000 s.f. the number of occupants would be 20.  One quarter of that is 5 occupants. If you are in another city, look on the city’s web page for the correct code. If it is a different year then Google “Table 1004.1.2 IBC and the year of the code”.

Table 1004.1.2
Portion of Table 1004.1.2

Restaurant dining rooms are considered Assembly areas. Most restaurants will be unconcentrated, meaning loose tables and chairs.  The Occupant load for dining areas is usually 15 s.f. per person.  Booths are fixed seating and it is one person per 24″ of the booth seat. Kitchens are 1 person per 200 s.f., storage areas are 1 person per 500 s.f. The waiting area and similar spaces may be included in the area, but not the toilet rooms.

If you look closely at the table you will see that some areas are based on net, and some on gross s.f.  Net square feet is inside, and exclusive of the walls.  Restaurants are based on net square feet.  Most other spaces are gross s.f.; that is the outermost dimensions of the building or space – the outside of the outside walls (or the centerline of demising walls between two occupants or between a space and a common area.

For larger spaces with a variety of spaces, it gets more complicated.  For example, a supermarket with retail areas, offices and storage spaces would calculate the occupancy for each type of space, that is 30 s.f. per person for the sales area, 300 s.f. per person for the storage area and 100 s.f. per person for the offices.

Toilet rooms and corridors are not generally included in the calculation because you are either in the office (whatever) or the toilet room, but not both.

If you have the drawings that were submitted to the City for Building Permit, the occupant load will be on the drawings, near the front, in section that says Code Analysis or Building Code.  If you do not have your drawings, I do not recommend calling the city. If your building was built before Ike, the records were lost in the storm.  After Ike, they will not have access to your drawings because they are stored in a secure location, and it could take the city some time to access them.

If you have a stand-alone building, you can find the size of the building from the Central Appraisal District database. Search by address. If you have a small space inside a larger building, you can look on your lease or measure your space to find out your area.

I’ve made a sample spreadsheet so you can see what a calculation might look like.

If you have a more complicated space and you need professional help to figure out the number of people allowed by Gov. Abbott’s proclamation, call or email me.

I will measure your space(s), calculate the occupant load, email you a signed and sealed letter stating the occupant load, email you a sign you can print and post on your doorway, and file the occupant load calculation with the City Marshal’s office. For spaces up to 5,000 s.f. the fee is only $100.  For spaces larger than 5,000 s.f. the fee is $200.

Michael Gaertner is an architect practicing in Galveston, Texas since 1980.

 

 

Advertisement

Making the most of your pre-development meeting with the City of Galveston

22 Monday Jan 2018

Posted by Michael Gaertner, Sr. in Uncategorized

≈ Leave a comment

The City of Galveston will schedule a Pre-Development meeting so that you can learn about City requirements and ask questions about your project.  Typically these meetings are held by way of Zoom Meeting, last an hour, and can be scheduled by calling (409) 797-3660.

To get the most out or your Pre-Development meeting, bring along this agenda:

Agenda for City of Galveston Pre-Development Meeting

  1. Describe the property, existing improvements and any proposed projects:
  2. Introduce the City Staff to the project.
  3. Provide the address of the site.
  4. If available, bring a copy of the survey to the meeting.
  5. Print a copy of the property information downloaded from the Galveston Central Appraisal District web site: http://galvestoncad.org. After navigating to the site, click on property search and search by property address. Once the property shows up, to the right of the white description line click on “View Details” and then click on “Expand All”. Print this web page and bring the printed copy to the Pre-Development meeting.
  6. If there are existing improvements on the site, describe them and how the existing improvements are currently being used.
    1. Show photographs of the existing improvements, if possible, from all four sides.
    2. If available, show drawings of the existing improvements.
  7. Describe in detail any proposed uses for the site, repairs or improvements being considered.
    1. If available, show drawings of the proposed improvements.

Questions for City Staff:

     Planning Department:

  1. What zoning classification is the site?
  2. Are the existing or proposed uses allowed under the City’s Land Development Regulations (zoning)?
  3. If the existing uses are legally non-conforming, under what circumstances would they no longer be allowed?
  4. If the existing or proposed uses are limited, what are the limitations?
  5. What other land use regulation are there for the site and the existing or proposed use (e.g. parking or landscaping requirements)?
  6. Is the site subject to any special land use requirements, for example, is it in a neighborhood conservation or historic district?
    1. Is it in the Height and Development District Zone; if so, is it in a section where the County has a maintenance easement for the Seawall?
    2. If there are special requirements, does the City have a handbook, guide or brochure describing the requirements and how to comply?
  7. According to the Land Development Regulations, what are the required setbacks for the site?

(NOTE: Zoning setbacks are not the same as the Fire Separation Distances required by the building code. Based on the type of wall construction, the number of openings and other factors, the building code may require that an exterior wall is located differently than what the zoning may allow. Fire separation distances can be determined once the type of construction and the fire rating of the exterior wall(s) are known.)

Public Utilities Department:

  1. Is the site served by municipal utilities and if so, what are the sizes of the water, sewer and, if applicable, storm sewer pipes?
  2. How is the stormwater runoff to be drained from the site?

Building Department and Fire Marshal

  1. What is the Base Flood Elevation requirement for the site?
  2. If there are existing improvements that do not meet the elevation requirements for floodplain, will the existing improvements be required to be raised to meet the requirements?
  3. If there are existing improvements that do not meet the Texas Department of Insurance requirements for Windstorm Resistant Design, will the existing improvements be required to be brought into compliance?
  4. What permits will I need before I can start construction?
  5. Will a driveway permit be required?
  6. Will sidewalks be required, if so, along which property lines?
  7. Does the site require any special permits, such as a Beachfront Construction Certificate and Dune Protection Plan?
  8. If there are existing improvements on the site:
    1. Are the existing improvements legally conforming?
    2. Are there any violations, citations or “red tags” on the existing improvements?
  9. Is there a Certificate of Occupancy for the existing improvements?
    (If so, get a copy).
  10. If repairs are needed for the existing improvements, will a building permit be required? (be sure to describe the repairs proposed in detail; describe the intended occupants and how they will use the spaces).
  11. If there is no change of use or change of occupancy proposed and the existing improvements are currently occupied (or were vacated within the last 6 months), can a Certificate of Zoning Compliance be issued for the building? (if so, fill out the form and request the Certificate).
  12. If there is not a Certificate of Occupancy for the existing improvements and the building will not qualify for a Certificate of Zoning Compliance, what is required to obtain a Certificate of Occupancy?
  13. If the existing improvements are to remain and be repaired or renovated, and a building permit is required:
    1. Is a monitored fire alarm system required to be added?
    2. Is a fire sprinkler system required to be added?
    3. Are fire separations (walls or ceilings) between different occupancy types required to be added?
  14. If the existing improvements are residential (one or two-family dwelling) and no improvements are proposed, but portions of the improvements will be used as live-work or home occupation use:
    1. Is a monitored fire alarm system required to be added?
    2. Is a fire sprinkler system required to be added?
    3. Are fire separations (walls or ceilings) between different occupants required to be added?
    4. Is the residence required to be made accessible?

NOTES: Pre-development meetings are usually limited to one hour.

IT IS RECOMMENDED THAT YOU RECORD THE PRE-DEVELOPMENT MEETING SO THAT YOU CAN REFER TO THE DISCUSSION LATER IF NEEDED. (USE THE VOICE RECORD FUNCTION ON YOUR SMARTPHONE OR BRING A VOICE RECORDER TO THE MEETING.)

A Pre-Development meeting is not a substitute for the services of a registered architect.

In Texas, private single-family dwellings, duplexes, and certain buildings with limited public access generally do not require an architect. Multi-family buildings require an architect if over 16 units or two stories in height. Most other commercial buildings, including additions and alterations to existing buildings, require an architect.

For a change of use or occupancy, the City of Galveston requires a building code summary prepared by a registered architect or engineer.

You may find it valuable to hire an architect to help you with your plans whether or not an architect is required by law. It is important that your architect is familiar with a change of use or occupancy and code requirements as well as the type of building or business you are considering.
This document is provided as a public service by Michael Gaertner Architect, who is solely responsible for its content.

Welcome

09 Thursday Aug 2012

Posted by Michael Gaertner, Sr. in Uncategorized

≈ Leave a comment

I’m not much of a writer, being an Architect, I think it must come from the wrong side of my brain or something.  But I’m going to give it a go and see where it leads. Maybe this will be an outlet that keeps me sane when there is so much craziness around me.

Who knows where this blog will go – certainly not me.

But if you want to go back to my company web page, click here

Recent Posts

  • What is my occupant load?
  • Making the most of your pre-development meeting with the City of Galveston
  • Guide to Change of Occupancy in the City of Galveston
  • Does Development Mean Environmental Destruction?
  • Welcome

Archives

  • April 2020
  • January 2018
  • June 2017
  • December 2012
  • August 2012

Categories

  • Architecture
  • In General
  • On the Island
  • Uncategorized

Meta

  • Register
  • Log in
  • Entries feed
  • Comments feed
  • WordPress.com

Create a free website or blog at WordPress.com.

Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To find out more, including how to control cookies, see here: Cookie Policy
  • Follow Following
    • Galveston Architect
    • Already have a WordPress.com account? Log in now.
    • Galveston Architect
    • Customize
    • Follow Following
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...